MakerFLOSS/docs/hardware/sw06.md
sjat 24007391f4
All checks were successful
Build docs site / build (push) Successful in 50s
Build slides / build (push) Successful in 1m8s
feat(rack): add shf05, move shf03 to U22 with sw06/sw07, rewire uplinks
Rack01 layout and cabling changes as physically mounted:

- shf03 moved U21 -> U22; shf04 stays at U21 (pair split).
- New shf05 at front U19 (empty).
- New shelf-mounted switches on shf03: sw07 (4-port 1G unmanaged,
  slot 1/left) and sw06 (9-port unmanaged, 8x2.5G + 1x10G, slot 2/right).
- Rewire: sw01:7 -> sw06:1 (repurposed from srv07 uplink),
  sw07:1 -> sw06:2, pp01:4 -> sw06:3, sw01:8 mgmt -> pp01:3.
- Drop pp02:8 -> sw01:7 rear patch; srv07 (staging) left without a LAN path.

Regenerated hardware index and rack01 elevation/page.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-07 22:00:30 +02:00

20 lines
450 B
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
hostname: sw06
kind: switch
status: in-use
rack: rack01
mounted_on: shf03
shelf_face: front
shelf_slot: 2
chassis_u: 1
ports: 9
---
## Notes
- 9-port unmanaged switch. Stands on shf03, right side (slot 2).
- Ports 1–8 are 2.5 GbE; port 9 is 10 GbE.
- Port 1 ← sw01:7 (LAN uplink from the rack switch, negotiates at 1 GbE).
- Port 2 ← sw07:1 (1 GbE).
- Port 3 ← pp01:4 (patched out to the working table).
- Port 9 (10 GbE) unused today.