MakerFLOSS/docs/hardware/sw06.md
sjat 24007391f4
All checks were successful
Build docs site / build (push) Successful in 50s
Build slides / build (push) Successful in 1m8s
feat(rack): add shf05, move shf03 to U22 with sw06/sw07, rewire uplinks
Rack01 layout and cabling changes as physically mounted:

- shf03 moved U21 -> U22; shf04 stays at U21 (pair split).
- New shf05 at front U19 (empty).
- New shelf-mounted switches on shf03: sw07 (4-port 1G unmanaged,
  slot 1/left) and sw06 (9-port unmanaged, 8x2.5G + 1x10G, slot 2/right).
- Rewire: sw01:7 -> sw06:1 (repurposed from srv07 uplink),
  sw07:1 -> sw06:2, pp01:4 -> sw06:3, sw01:8 mgmt -> pp01:3.
- Drop pp02:8 -> sw01:7 rear patch; srv07 (staging) left without a LAN path.

Regenerated hardware index and rack01 elevation/page.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-07 22:00:30 +02:00

450 B
Raw Blame History

hostname kind status rack mounted_on shelf_face shelf_slot chassis_u ports
sw06 switch in-use rack01 shf03 front 2 1 9

Notes

  • 9-port unmanaged switch. Stands on shf03, right side (slot 2).
  • Ports 1–8 are 2.5 GbE; port 9 is 10 GbE.
  • Port 1 ← sw01:7 (LAN uplink from the rack switch, negotiates at 1 GbE).
  • Port 2 ← sw07:1 (1 GbE).
  • Port 3 ← pp01:4 (patched out to the working table).
  • Port 9 (10 GbE) unused today.