MakerFLOSS/docs/hardware/sw06.md
sjat cfaf06510b
All checks were successful
Build docs site / build (push) Successful in 49s
Build slides / build (push) Successful in 1m8s
docs(hardware): record srv07 rear patch pp02:8 -> sw06:4
Confirmed on-site 2026-07-17: srv07's single NIC runs eth0 -> pp02:8,
rear-patched to sw06:4 — the patch that restored its LAN path.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 17:28:49 +02:00

21 lines
532 B
Markdown
Raw Permalink Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
hostname: sw06
kind: switch
status: in-use
rack: rack01
mounted_on: shf03
shelf_face: front
shelf_slot: 2
chassis_u: 1
ports: 9
---
## Notes
- 9-port unmanaged switch. Stands on shf03, right side (slot 2).
- Ports 1–8 are 2.5 GbE; port 9 is 10 GbE.
- Port 1 ← sw01:7 (LAN uplink from the rack switch, negotiates at 1 GbE).
- Port 2 ← sw07:1 (1 GbE).
- Port 3 ← pp01:4 (patched out to the working table).
- Port 4 ← pp02:8 (srv07 eth0, since 2026-07-17 — restored srv07's LAN path).
- Port 9 (10 GbE) unused today.