MakerFLOSS/docs/hardware/sw06.md
sjat cfaf06510b
All checks were successful
Build docs site / build (push) Successful in 49s
Build slides / build (push) Successful in 1m8s
docs(hardware): record srv07 rear patch pp02:8 -> sw06:4
Confirmed on-site 2026-07-17: srv07's single NIC runs eth0 -> pp02:8,
rear-patched to sw06:4 — the patch that restored its LAN path.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 17:28:49 +02:00

532 B
Raw Permalink Blame History

hostname kind status rack mounted_on shelf_face shelf_slot chassis_u ports
sw06 switch in-use rack01 shf03 front 2 1 9

Notes

  • 9-port unmanaged switch. Stands on shf03, right side (slot 2).
  • Ports 1–8 are 2.5 GbE; port 9 is 10 GbE.
  • Port 1 ← sw01:7 (LAN uplink from the rack switch, negotiates at 1 GbE).
  • Port 2 ← sw07:1 (1 GbE).
  • Port 3 ← pp01:4 (patched out to the working table).
  • Port 4 ← pp02:8 (srv07 eth0, since 2026-07-17 — restored srv07's LAN path).
  • Port 9 (10 GbE) unused today.