MakerFLOSS/docs/hardware/sw01.md
sjat 24007391f4
All checks were successful
Build docs site / build (push) Successful in 50s
Build slides / build (push) Successful in 1m8s
feat(rack): add shf05, move shf03 to U22 with sw06/sw07, rewire uplinks
Rack01 layout and cabling changes as physically mounted:

- shf03 moved U21 -> U22; shf04 stays at U21 (pair split).
- New shf05 at front U19 (empty).
- New shelf-mounted switches on shf03: sw07 (4-port 1G unmanaged,
  slot 1/left) and sw06 (9-port unmanaged, 8x2.5G + 1x10G, slot 2/right).
- Rewire: sw01:7 -> sw06:1 (repurposed from srv07 uplink),
  sw07:1 -> sw06:2, pp01:4 -> sw06:3, sw01:8 mgmt -> pp01:3.
- Drop pp02:8 -> sw01:7 rear patch; srv07 (staging) left without a LAN path.

Regenerated hardware index and rack01 elevation/page.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-07 22:00:30 +02:00

587 B
Raw Blame History

hostname kind status rack rack_u u_height rack_face ports links
sw01 switch in-use rack01 23 1 front 10
local peer peer_port speed_gbps
7 sw06 1 1
local peer peer_port
8 pp01 3

Notes

  • 10 ports: p1–p8 are 1 GbE; sfp1–sfp2 are 2.5 GbE SFP+ (unused today).
  • p1–p6 carry server uplinks via pp02 (pp02:2–7 → sw01:1–6).
  • p7 uplinks to sw06:1 (aggregation switch on shf03) — repurposed from the former srv07 uplink.
  • p8 is the management port, patched out via pp01:3 to the working table (white cable) — non-active.