Rack01 layout and cabling changes as physically mounted: - shf03 moved U21 -> U22; shf04 stays at U21 (pair split). - New shf05 at front U19 (empty). - New shelf-mounted switches on shf03: sw07 (4-port 1G unmanaged, slot 1/left) and sw06 (9-port unmanaged, 8x2.5G + 1x10G, slot 2/right). - Rewire: sw01:7 -> sw06:1 (repurposed from srv07 uplink), sw07:1 -> sw06:2, pp01:4 -> sw06:3, sw01:8 mgmt -> pp01:3. - Drop pp02:8 -> sw01:7 rear patch; srv07 (staging) left without a LAN path. Regenerated hardware index and rack01 elevation/page. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
18 lines
351 B
Markdown
18 lines
351 B
Markdown
---
|
|
hostname: sw07
|
|
kind: switch
|
|
status: in-use
|
|
rack: rack01
|
|
mounted_on: shf03
|
|
shelf_face: front
|
|
shelf_slot: 1
|
|
chassis_u: 1
|
|
ports: 4
|
|
links:
|
|
- { local: "1", peer: sw06, peer_port: 2, speed_gbps: 1 }
|
|
---
|
|
|
|
## Notes
|
|
|
|
- 4-port unmanaged 1 GbE switch. Stands on shf03, left side (slot 1).
|
|
- Uplink: port 1 → sw06:2 (a 2.5 GbE port, negotiates at 1 GbE).
|