Rack01 layout and cabling changes as physically mounted: - shf03 moved U21 -> U22; shf04 stays at U21 (pair split). - New shf05 at front U19 (empty). - New shelf-mounted switches on shf03: sw07 (4-port 1G unmanaged, slot 1/left) and sw06 (9-port unmanaged, 8x2.5G + 1x10G, slot 2/right). - Rewire: sw01:7 -> sw06:1 (repurposed from srv07 uplink), sw07:1 -> sw06:2, pp01:4 -> sw06:3, sw01:8 mgmt -> pp01:3. - Drop pp02:8 -> sw01:7 rear patch; srv07 (staging) left without a LAN path. Regenerated hardware index and rack01 elevation/page. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
22 lines
558 B
Markdown
22 lines
558 B
Markdown
---
|
|
hostname: pp01
|
|
kind: patch-panel
|
|
status: in-use
|
|
rack: rack01
|
|
rack_u: 24
|
|
u_height: 1
|
|
rack_face: front
|
|
ports: 9
|
|
links:
|
|
- { local: "1", peer: wan01, peer_port: 1 }
|
|
- { local: "4", peer: sw06, peer_port: 3 }
|
|
---
|
|
|
|
## Notes
|
|
|
|
- Port 1 → wan01 (WAN line 1, active). Fed from pp02:1 (srv01 eth0).
|
|
- Port 2 → wan02 (WAN line 2), set up but non-active.
|
|
- Port 3 ← sw01:8 (switch management), patched out to the working table
|
|
(white cable), non-active.
|
|
- Port 4 → sw06:3 (aggregation switch on shf03), patched out to the working
|
|
table (black cable).
|