Commit graph

2 commits

Author SHA1 Message Date
cfaf06510b docs(hardware): record srv07 rear patch pp02:8 -> sw06:4
All checks were successful
Build docs site / build (push) Successful in 49s
Build slides / build (push) Successful in 1m8s
Confirmed on-site 2026-07-17: srv07's single NIC runs eth0 -> pp02:8,
rear-patched to sw06:4 — the patch that restored its LAN path.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 17:28:49 +02:00
24007391f4 feat(rack): add shf05, move shf03 to U22 with sw06/sw07, rewire uplinks
All checks were successful
Build docs site / build (push) Successful in 50s
Build slides / build (push) Successful in 1m8s
Rack01 layout and cabling changes as physically mounted:

- shf03 moved U21 -> U22; shf04 stays at U21 (pair split).
- New shf05 at front U19 (empty).
- New shelf-mounted switches on shf03: sw07 (4-port 1G unmanaged,
  slot 1/left) and sw06 (9-port unmanaged, 8x2.5G + 1x10G, slot 2/right).
- Rewire: sw01:7 -> sw06:1 (repurposed from srv07 uplink),
  sw07:1 -> sw06:2, pp01:4 -> sw06:3, sw01:8 mgmt -> pp01:3.
- Drop pp02:8 -> sw01:7 rear patch; srv07 (staging) left without a LAN path.

Regenerated hardware index and rack01 elevation/page.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-07 22:00:30 +02:00