The cable-pull needs the basement, so it becomes the recorded version and the
live demo is an HA failover instead: tappaas1 carries vm:110 (firewall),
vm:130 (mothership) and vm:140 (identity), all fenced and watchdog armed.
Verified against ha-manager on the cluster.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Was "two public repositories" — the Documentation repo (tappaas.org) was
missing. All three are now listed by their Codeberg path.
"You can check my homework" folds into the lead-in rather than standing as its
own line: with the nine-row table above it, the extra line pushed the last
bullet off the slide.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Adds a slide after the hardware diagram showing the two racks side by side —
the MakerFLOSS rack at Orange Makerspace and the one at home — to make the
point that the module contract is what lets those two rooms run the same
system.
build-slides.sh now copies image files from slides/ into the output tree at
the same relative path. Marp keeps relative image URLs, so without this the
images would 404 on the published site. Guarded against the local build,
where OUTPUT_DIR is the source directory and the copy would be a no-op onto
itself. This is the first deck in the repo with images; the convention is
documented in docs/services/slides.md.
Photos resampled to 1200px on the long edge (~300 KB each) from the 3072x4080
originals.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Last TODO closed: the pre-TAPPaaS setup ran five years uninterrupted and never
had a name.
Guardrail 1 now says 2-3 artefacts rather than three — the Issue is always
there, the ADR and the plan only when the change warrants them.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
The graph replaces the prose slide that stood in for it — annotated with the
vacation that explains the Sept/Oct 2025 flat spot, and regenerated so August
runs to the 25th (126). Keeps the one line worth saving from the slide it
replaces: the services stayed up through the flat bits.
Also: "every commit" rather than "every line" on the never-push guardrail;
Home Assistant as the suggested first service; evaluation tier calls for two
disks.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
The ADR-007 rewrite was the move from a flat pile of sequenced scripts to the
manager/controller paradigm — not the dependsOn change. That was an earlier
and separate rewrite, ADR-003: a plain install.sh per module replaced by
dependsOn/provides contracts the platform resolves into an order.
Also: a closing line on the hardware slide that this is one of five known
instances, and the September 2025 gap now answers itself.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Guardrail 1 is now the process that runs before the AI is allowed to type:
an Issue with a defined problem and proposed fix, an ADR reviewed by at least
two people for anything non-obvious, then a design and implementation plan
that says how it will be tested. The eight agent roles move here — they are
what "then the AI takes over" means.
Guardrail 5 replaces "I stayed the reviewer" with the test regime: quick test
on every change, deep test via test-module.sh --deep, test plan authored in
the ADR, and a full regression across every module after implementation.
Test figures reconciled to one scope across the deck (both repos): 195 suites,
34,490 lines, 27% of source.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Drop the commit-graph slide and the two cost slides. Replace all three with
one argument: the platform is expensive to build, but that cost is fixed and
per-site cost is near zero — so it only makes sense shared across many home
labs and SMB sites.
"What I got wrong" becomes "Did I get it all right?" — no, two large rewrites
(ADR-007 numbering to dependsOn, ADR-014 zone tiers to checked state) plus a
predecessor system run for years before this one.
36 slides; the agenda line and the quiet-months slide no longer refer to the
graph that left.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Split the single architecture slide into two: the iron (three nodes, switch,
AP, modem) and the software (foundation band with the AI and productivity
stacks above it). Both read off the running cluster via tappaas-cicd, not
from docs — CPU, RAM, pool topology, link speeds and switch ports are live
values.
The VM layer-cake is inline SVG rather than mermaid: mermaid ignores
`direction LR` inside a subgraph that has a cross-boundary edge, so the bands
came out as a 629x1258 column.
Module slide now counts all three sources — 8 foundation + 12 apps +
21 Community = 41 — and slide 3 is recomputed for today.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Talk announced at pretalx.varum.dk/sommerhack-2026/talk/WD8EVP/ —
27 August, Taler Teltet, 60 minutes.
Figures come from the repo rather than the abstract: commit counts and the
per-month graph from git log, source counts from src/STATISTICS.md as
regenerated 2026-08-23. Twelve TODO markers remain for the personal
material (costs, the autumn 2025 dip, war stories).
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>