2026-07-07 22:00:30 +02:00
|
|
|
|
---
|
|
|
|
|
|
hostname: sw06
|
|
|
|
|
|
kind: switch
|
|
|
|
|
|
status: in-use
|
|
|
|
|
|
rack: rack01
|
|
|
|
|
|
mounted_on: shf03
|
|
|
|
|
|
shelf_face: front
|
|
|
|
|
|
shelf_slot: 2
|
|
|
|
|
|
chassis_u: 1
|
|
|
|
|
|
ports: 9
|
|
|
|
|
|
---
|
|
|
|
|
|
|
|
|
|
|
|
## Notes
|
|
|
|
|
|
|
|
|
|
|
|
- 9-port unmanaged switch. Stands on shf03, right side (slot 2).
|
|
|
|
|
|
- Ports 1–8 are 2.5 GbE; port 9 is 10 GbE.
|
|
|
|
|
|
- Port 1 ← sw01:7 (LAN uplink from the rack switch, negotiates at 1 GbE).
|
|
|
|
|
|
- Port 2 ← sw07:1 (1 GbE).
|
|
|
|
|
|
- Port 3 ← pp01:4 (patched out to the working table).
|
2026-07-17 17:28:49 +02:00
|
|
|
|
- Port 4 ← pp02:8 (srv07 eth0, since 2026-07-17 — restored srv07's LAN path).
|
2026-07-07 22:00:30 +02:00
|
|
|
|
- Port 9 (10 GbE) unused today.
|